
Electrical & Lighting Equipment Manufacturing
Shorter lead times and simpler production
Logio partnered with Modus to redesign production planning and scheduling and to streamline semi‑finished inventory.

Outcome
Fewer production phases and a significantly reduced set of semi‑finished blanks improved flow and shortened order‑to‑delivery times.
Semi‑finished variants
-0%
Lead time reduced from
from 0 weeks
About Modus
Modus is a Czech manufacturer of professional luminaires, active since 1994 and among the country’s leading producers and exporters. Headquarters and sales are based in Jinočany near Prague, with production and technical support across the Czech Republic.
Founded: 1994
Scale: 25,000 luminaires produced per week
Team size: 250–499 employees (2023)
Initial challenge
Modus faced long delivery times and inefficient planning across a weekly output of approximately 25,000 products. Inventory of semi‑finished parts was complex and created waste in production.

Project goal
Increase information support for planning, reduce the number of production stages, and define a smaller set of semi‑finished items to stock in order to shorten end‑to‑end lead time.

Solution
Redesign production planning and scheduling

Solutions implemented
KPI Design & Performance Monitoring
Capacity Planning

Impact
Simpler flow, faster delivery.
Slimmer semi‑finished portfolio
Reduced blanks from about 6,000 to 1,700, cutting complexity in planning and storage.
Fewer production phases
Simplified routing that reduces handovers and waiting.
Shorter end‑to‑end lead time
Faster order‑to‑handover through better scheduling and inventory setup.
Less waste in production
Fewer variants and clearer routings reduce rework and idle time.
Scalable method
The route‑modeling approach can be replicated across other Coop units and retail chains.
Let’s simplify your manufacturing flow
If your production planning is complex and lead times keep slipping, we can help you redesign planning, inventory of semi‑finished parts, and KPIs for faster throughput. Let’s talk.
We tackled many supply chain challenges
Ergonomics‑led productivity for a steel processor
Lean housekeeping and ergonomic improvements lifted productivity fast and set conditions for healthier, more stable operations.
+10 % labor productivity in 2 months
Up to –30 % long‑term sickness expected
Portfolio optimization and control tower for Laufen
Laufen reduced portfolio complexity by proposing the removal of 40% inefficient items and defined a supply chain control tower to coordinate end‑to‑end flow, with €5M savings potential identified.
−40% inefficient items proposed for delisting
€5M potential savings identified